The Housing Report: July 31, 2009
Over the past week, the crew has been paying a lot of attention to details inside the house. So, crown molding is going up, tile work is almost completed and capitals are on many of the door frames. It's amazing the level of detail we have - and that we didn't know about! Check out the pics below to see how it's all coming together.
The small details that make a difference. Check out how the molding creates a single line from the family room to the kitchen.
The ceiling detail in the family room.
Historic capitals that decorate the door frames.
The 2nd floor bathroom and the railing that runs along the top of the window around the room.
A shot of the subway tile work (for a more classic presentation) in the 2nd bathroom shower. You can see how it doesn't go to the ceiling. Instead, it remains slightly open. And to the right of the shower will be a cabinet and shelves for towels, etc. The subway tile wraps the room and covers approximately 1/3 of the wall.
The master bath shower tile work. We chose a large format for a more simplified approach.
<< Home